Outsourcing construction estimating means sending the drawings for a job to an outside estimator, who measures the quantities, prices each trade and sends back an estimate you can budget or tender from. With us you order each job on our estimate form by uploading the plans, answering the questions for that building type and paying the fee by card. Every estimate is checked before it's released and emailed to you as a PDF within 48 hours (two business days). There's nothing to sign up to and you pay for the jobs you send.
When it makes sense to outsource your estimating
Estimating can swing a long way from month to month: one week your estimator has time to spare and the next there are several tenders, new jobs and production estimates due at once. Sending work out gives you extra estimating capacity without the cost and commitment of employing another full-time estimator. It tends to make sense when:
- tenders are coming in faster than your team can price them
- your estimator is overloaded or on leave
- the business is growing and the estimating hasn't kept up
- you need extra capacity for a few months without making a new hire
- senior staff are spending their time on estimating and paperwork
Because each job is ordered and paid for on its own, you can send us every job you price or only the overflow.
What you can hand over
On the form you choose one of three levels of detail for each whole job. A standard estimate prices the whole job across every trade group, for a budget or a feasibility. A full line-by-line gives every line with its quantity and rate, for tenders and checking quotes. Choose Both documents to get the two in one order.
The form takes single and double storey homes, dual occupancies and duplexes, multi unit and townhouse developments, apartment buildings, extensions and renovations, and commercial builds and fit-outs. If you only need some trades priced off a set of house plans, pick Trades and tick the ones you need.
Production estimating and master bills of quantities for your standard designs aren't on the form. Call us on 0421 307 603 to talk one through.
What to send with each job
Every job needs the architectural plans as a PDF, meaning the floor plans, elevations and sections the takeoff is measured from. The other drawings are optional on most jobs and each one firms up part of the estimate:
- the civil and survey drawings, such as the site plan, contours, drainage, engineering and soil report, sharpen the site works, the drainage and the slab
- a scope of works or your client's selections lets the estimate match the finish level for the kitchen, bathrooms and flooring
On a multi unit or townhouse development the site plan and civil drawings are required, because the site works are measured off them.
The form then asks the questions for that building type, like the storeys, the slab or footing type, the soil class and the roofing on a house, or the unit types on a development. Tick the site boxes that apply, like trees to remove, an existing structure to demolish or a sloping site. Work like this is listed on the estimate as excluded unless the plans show it or the form says so. Use the box headed Anything not on the plans to tell us about site access, the spec level and anything your client has supplied or left out.
Our article on the drawings an estimate needs goes through each drawing and what it changes.
What comes back
The standard estimate opens with the estimated project cost and a total for each trade group. On our sample estimate for a single storey home of 198.32 m2 that's twelve trade groups, from site preparation and the slab through to internal fit-out, services and external works, followed by the preliminaries and fees, GST and a total of $561,086 incl GST.

The full line-by-line starts with an index of its cost centres and their subtotals, then lists every priced item under its cost centre with its code, quantity, rate and amount. The sample runs to 312 lines across 83 cost centres.
Every priced line on both documents is marked From the plans, Allowance or Quote. From the plans means it was measured off your drawings, an allowance is a set amount for you to confirm, and a quote line needs a trade quote. In the sample's underground electrical connection, the prescribed certificate, the inspection and the meter box padlock are From the plans. The temporary power in a permanent position is an Allowance of $2,124. The extra 8 lineal metres of telephone conduit is another, at $29.50 a metre. A note at the foot of the cost centre says the client supplies the electrical pit before the site starts. The measured lines stand on your drawings, while the allowance and quote lines are the ones to firm up with trade prices before you tender or sign a contract.

Each estimate ends with what's excluded. The sample lists tree removal, demolition, a stormwater detention tank and pump, retaining walls, a sewer or stormwater pump and a new crossover, because none of them was shown on the plans or noted on the form. The first page of every estimate shows the day it was prepared and the day it's valid until, 30 days later.
What it costs
Each job has its own fixed fee, set by the building type, its size and the level of detail you choose. A standard estimate starts at $399 + GST on a single storey home, $499 on a double storey, $399 on a dual occupancy or duplex with one new dwelling and $599 on an extension or renovation. The full line-by-line starts at $799 + GST on a single storey home. A single trade is $249 + GST, then $99 for each trade after it.
You see your exact fee on the form and pay it in full by card when you order. A tax invoice comes with your receipt. Every fee for every building type is on Outsourced Estimating. Our article on what an estimate costs sets out what moves the fee.
How long it takes
Our usual turnaround is 48 hours (two business days) from when you've paid and uploaded the plans. Business days run Monday to Friday and don't count Victorian public holidays. A job ordered on a weekend or a public holiday starts on the next business day.
Large or complex jobs, commercial, apartment and multi unit jobs, and heavily revised or incomplete plan sets can need their own timeframe. If yours does, we'll let you know and give you a new date.
What to check before you send a job out
Whoever you send your estimating to, a handful of questions tell you what you're getting. Here's each one and how it works with us.
- Ask whose rates the job is priced on. We price every job in our specialised estimating program against our own rate library of approximately 6,000 items, on the price list for the job's state.
- Ask whether a person checks the estimate before it reaches you. Every one of ours is checked before it's released.
- Ask how the measured lines are marked apart from the allowances. Ours are marked From the plans, Allowance or Quote, line by line.
- Ask what's left out. Our exclusions are listed on the estimate itself.
- Ask what the fee is before you send the plans. Ours is shown on the form before you pay.
- Ask for a turnaround you can plan a tender around. Ours is 48 hours (two business days) on a standard, fully documented job.
- Ask whether the estimator has building experience. We've been building in Melbourne since 2005.
- Ask what happens to your plans. Under our estimating terms they're kept confidential, used only for your job and shared only with the staff, advisers and service providers who need them, or where the law requires it.
What the fee doesn't include
An outsourced estimate prices the job off your drawings. Unless it's agreed in writing, our fee doesn't cover getting live quotes from suppliers or subcontractors, running or submitting your tender, site inspections or measured surveys, or design, engineering, building approvals and permits. You still run the tender and get your trades to price the lines marked Quote.
Once the estimate is paid for, our terms let you use, copy and share it for that project with your consultants, financier, suppliers and tender team, as long as its assumptions and exclusions go with it. Give each trade the lines for their work along with the exclusions. Every trade then prices the same quantities.
Jobs outside Victoria
We estimate jobs anywhere in Australia off the plans you upload. The form asks for the site's state and, on a house, whether it's in a capital city metro area or a regional or country area. Every estimate is priced based on the job's location. If the job is in Melbourne or Sydney, it uses that state's price list.
Questions and drawing changes after delivery
The fee covers one round of minor clarifications within 10 business days of delivery, as long as the drawings haven't changed. If we've made an error, we fix it at no charge. A new drawing revision, an added dwelling or an added trade can be a variation. Before we start on one we'll tell you what it changes in the fee and the turnaround and wait for your written okay.
Your estimate is valid for 30 days from the date on it. After that, check it against current trade quotes before you sign a building contract.