Rear courtyard of the Hughesdale dual occupancy at dusk

Construction Estimating Services

Whole-job estimates off your plans for builders, developers and owner-builders.

From $399

Estimates, plus GST

48 hours

Back in your inbox

Australia-wide

Any state or territory

Since 2005

Building in Melbourne

What You Can Order

Standard estimate

From $399 + GST

The whole job priced across every trade group, for a budget or a feasibility.

Order This

Full line-by-line

From $799 + GST

Every line with its quantity and rate, for tenders and checking quotes.

Order This

Both documents

From $1,099 + GST

The summary for your client and the itemised detail for you, in one order.

Order This

A Sample Estimate

The standard estimate and the line-by-line for a single storey home.

Fees

Building typeStandard estimateFull line-by-lineBoth documentsStart
Single Dwelling, Single Storey$399$799$1,099Start Single Dwelling, Single Storey
Single Dwelling, Double Storey$499$899$1,299Start Single Dwelling, Double Storey
Dual Occupancy, Single Storey$399$799$1,099Start Dual Occupancy, Single Storey
Dual Occupancy, Double Storey$499$899$1,299Start Dual Occupancy, Double Storey
Multi Unit Developments$799$1,199$1,899Start Multi Unit Developments
Apartments$999$1,599$2,499Start Apartments
Extension or Renovation$599$999$1,499Start Extension or Renovation
Commercial$1,299$2,299$3,499Start Commercial
Basement Construction$599$899$1,199Start Basement Construction
Suspended Slab Construction$599$799$1,099Start Suspended Slab Construction
TradesFirst
trade
$249
Each
extra trade
$99
Start Trades
  • All fees are plus GST.
  • The estimate form shows the exact fee before you pay.
  • Dual occupancy fees cover one new dwelling. A second new dwelling is $199 more.
  • Multi unit fees cover three units, then $299 for each unit over three.
  • Apartment fees cover four levels. Five to eight levels is $499 more, nine to twelve $799, thirteen or more $999.

What's in an Estimate

What it covers

The estimate covers the whole job, from site works, slab and frame through to fit-out and finishes, laid out in the trade groups a builder works in. The standard estimate gives each group its total. The line-by-line lists every item with its quantity and rate, about 280 lines on a single storey house and more on a double.

What you send us

Your architectural plans as a PDF are the one thing we need. Site plans, civil and survey drawings and the structural engineering sharpen the site works, slab and frame. The more of these you send, the fewer allowances the estimate needs.

How it's priced

Quantities are taken off your plans and priced against our rate library of approximately 6,000 items, using our specialised estimating program, which also has rates for every state in Australia. Each line on the estimate is marked From the plans, Allowance or Quote.

Who checks it

We check every estimate before it's released. Anything your plans don't show, like the soil class or a sloping block, is flagged on the estimate for you to confirm.

What's left out

Items your plans and answers don't cover are listed on the estimate as exclusions.

Who We Estimate For

Living room in the Beaumaris renovation

Builders

Extra estimating capacity without the cost and commitment of a full-time estimator.

Rear garden of the Oakleigh townhouses

Developers

Feasibility budgets on dual occs, townhouses and unit sites before you commit to the land.

Kitchen in the Carnegie custom home

Owner-builders

A full bill of quantities to budget the job and price your trades against.

We also estimate for commercial and civil builders, architects and trades.

How an Estimate Works

  1. Upload your plans

    Architectural plans as a PDF, plus engineering and site plans if you have them.

  2. Answer a few questions

    Slab, walls, roof and the rest, then pay online by card.

  3. We check the draft

    We price it against our rate library and check it before it goes out.

  4. It lands in your inbox

    As a PDF, within 48 hours (two business days).

Questions about Estimates

What is a construction estimating service?

It's an estimator pricing your job off the drawings before it's built or tendered. We take the quantities off your plans, price each one against our rate library and set the estimate out in the trade groups a builder works in. Builders, developers and owner-builders use it to set a budget, test a feasibility or price a tender.

How much does an estimate cost?

A standard estimate starts at $399 + GST on a single storey home. The fee is set by the building type, its size and how much detail you pick. Every fee is in the table on this page. The form shows your exact fee before you pay. Our article on quantity surveyor costs compares their fees with ours.

How long does it take?

Within 48 hours (two business days) once you've paid and uploaded your plans. Business days run Monday to Friday and don't count Victorian public holidays. A large commercial, apartment or multi unit job can need longer. If yours does, we'll let you know and give you a new date.

How long is an estimate valid for?

Your estimate is valid for 30 days from the date on it. Its first page shows the day it was prepared and the day it's valid until. After that, check it against current trade quotes before you sign a building contract.

How accurate is the estimate?

It's as accurate as the drawings it's priced from. A full set with engineering and a site plan leaves little to allow for, where a floor plan on its own leaves more of the job as allowances. Every line on the estimate is marked as From the plans, Allowance or Quote.

What's the difference between the standard estimate and the line-by-line?

The standard estimate gives a total for each trade group, for a budget or a feasibility. The full line-by-line lists every item with its quantity and rate, about 280 lines on a single storey house, for tenders and checking quotes. Choose Both documents to get the two in one order.

Do you estimate jobs outside Victoria?

Yes, we estimate jobs anywhere in Australia off the plans you upload. Every estimate is priced based on the job's location. If the job is in Melbourne or Sydney, it uses that state's price list.

Can I ask questions once I have the estimate?

Yes, the fee covers one round of minor clarifications within 10 business days of delivery, as long as the drawings haven't changed. If we've made an error, we fix it at no charge. A new drawing revision or added scope can be a variation. We'll tell you its fee and timing before we start on it.

Is GST included?

No, our fees are listed plus GST. You pay the full fee by card when you order. A tax invoice comes with your receipt.

Get an estimate on your next job

Get an Estimate

Questions first? Call us on 0421 307 603.